Centralized Load Control

In late-2006, a concept known as the “Centralized Load Control” (CLC) System had been implemented at JFK, and the station, like the nucleus of an atom, had become the core of it all.

Brainchild of Michael Steinbuegl, JFK Station Manager, the procedure, following trends set by Swiss International in New York, Lufthansa in Cape Town, and SAS in Bangkok, had its origins in an earlier investigative project in which he had explored cost reductions by means of a large, single Centralized Load Control department in Vienna or several regional ones, although the latter inherently carried language and time zone obstacles.  Michael, former Aircraft Handling Manager, had amassed considerable experience creating operational procedures and methods, central to which had been weight and balance.

Seeking to apply this knowledge and simultaneously attempting to rectify the system incompatibility and communication difficulties encountered with the SAS-Bangkok arrangement in Washington, he tackled this station first, which, like JFK, already used the Lufthansa-WAB system.  In the process, he set the course for the many transitions to come by making several duty trips to establish local station-compatible procedures and then drafting a detailed booklet concerning them.  The first centralized load sheet for the Washington flight, OS 094, occurred on November 1, 2006.

Charlie Schreiner, the head of Austrian Airlines Load Control, subsequently marked the occasion with the following words:  “With Austrian Airlines Flight OS 094 on November 1, our first line station had been connected to a regular Centralized Load Control process with ULD aircraft.  All activities toward the operational flight preparation, load planning, ULD coordination, and WAB System documentation, inclusive of the load sheet transmitted to the cockpit via ACARs, had been successfully controlled by our JFK station yesterday.  I would like to thank our colleagues Mike Steinbuegl and Robert Waldvogel for the professional and excellently organized preparation of the CLC procedures, as well as the Austrian ladies, Regula Munz and Eva Lingeman in Washington and the handling agents in JFK and Washington (Swissport and SAS Scandinavian Airlines System) in their engaging work during this transition.  This good work had also led to the first flight departing three minutes ahead of its scheduled departure time.  I wish all participants continued success in the CLC process.”

The remainder of the CLC program, however, involved phased implementation.  In May of the following year, service had been reinaugurated from Chicago.  Because this could now be considered a “new” station, it logically followed that its load sheet would be integrated into the CLC system from the start and, despite computer system differentiations, had been successfully adapted with the first flight on May 29 after procedural modifications.

With these cities being handled by JFK, it had been decided to integrate the last North American station, Toronto, whose first centralized load sheet had been issued on July 1.

Three Austrian Airlines-dedicated Swissport Load Controllers, two of whom had worked on a given day during the peak summer season, had formed the Centralized Load Control System team.

Since the fourth station had been integrated, JFK had produced some 120 load sheets per month, and the highly successful system had yielded numerous benefits.

1. It had, first and foremost, produced considerable savings.

2. All flights had departed on time relative to load plan and load sheet preparation.

3. All four North American flights had been operationally handled by only one more daily Load Controller than JFK had had for a single departure.

4. All loading instruction reports and load sheets had been generated in the Lufthansa-WAB system.

5. And Vienna had had immediate access to all load control-related data and documentation.

  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

1 comments:

Anonymous said...

Because this could now be considered a “new” station, it logically followed that its load sheet would be integrated into the CLC system from the start